<nobr id="fn97t"><meter id="fn97t"><dfn id="fn97t"></dfn></meter></nobr>

    <nobr id="fn97t"><meter id="fn97t"><delect id="fn97t"></delect></meter></nobr>

          <nobr id="fn97t"></nobr>

            <nobr id="fn97t"><meter id="fn97t"></meter></nobr>

              <track id="fn97t"></track>

                <font id="fn97t"></font>

                <sub id="fn97t"><meter id="fn97t"><cite id="fn97t"></cite></meter></sub>

                      Welcome to VANJOIN. Your satisfaction is our biggest pursuit. Mobile Site
                       
                      Current Location:Home > Technical Support > TECHNICAL TRAINING

                      Installation Instruction

                       

                      1.   Responsibility Scope:

                       

                      Contract equipment supplied by the seller shall be installed, adjusted and tested by the seller under the supervision and guidance of the seller’s engineers in accordance with the technical documents, inspection standards, drawings and instructions provided by the seller. The buyer should provide relevant personnel, facilities, materials and tools to assist the installation work, adjust and inspection.

                      Seller’s engineers train the end user’s staff to operate the machines at site

                      Seller shall provide foundation layout drawing within 20 days from order confirmation.

                      Part books and operation & maintenance instructions are available. The language used in the computer system shall be Chinese or English.

                       

                      2.   Installation period:

                       

                      Installation shall be started from the date the seller’s personnel arriving on the site. Installation period is planned to be around thirty (30) working days in total.

                      3.   Personnel for Installation:

                       

                      When installation starts, the Seller will dispatch three (3) engineers and one (1) translator to the site to provide supervision and installation service.

                       

                      4.   Buyer Should Provide:

                      All the charges for engineers and translator (like air tickets, accommodation, food, communication, local transport charges, charges for applying visas and so on) shall be for the buyer’s account. Accommodation for engineers and translator should be standard double room with bathroom.

                      The buyer shall provide all necessary facility for engineers and translator of Vanjoin Group such as office with air conditioner, internet, fax machine, telephone, etc.

                      Buyer shall provide at least 6 local workers, and the workers required related to installation work will be listed after confirmation of the equipments and plant design.

                      The buyer needs to prepare the hoisting equipment, welding cut bit, acetylene gas and oxygen and gas pipe, and fitting tools and foundation construction. Scaffold for installation of building enclosed construction.

                       

                         Notes: For related charges, please directly contact VANJOIN via [email protected]

                      Add:Floor 14, Golden Block, Poly Champagne International Building, Hanxi No.1 Road, Qiaokou District, Wuhan City, Hubei Province, 430034 China
                      Copyright 2016 Hubei Vanjoin Group All Rights Reserved.
                      北京多乐彩平台安全

                      <nobr id="fn97t"><meter id="fn97t"><dfn id="fn97t"></dfn></meter></nobr>

                        <nobr id="fn97t"><meter id="fn97t"><delect id="fn97t"></delect></meter></nobr>

                              <nobr id="fn97t"></nobr>

                                <nobr id="fn97t"><meter id="fn97t"></meter></nobr>

                                  <track id="fn97t"></track>

                                    <font id="fn97t"></font>

                                    <sub id="fn97t"><meter id="fn97t"><cite id="fn97t"></cite></meter></sub>

                                          <nobr id="fn97t"><meter id="fn97t"><dfn id="fn97t"></dfn></meter></nobr>

                                            <nobr id="fn97t"><meter id="fn97t"><delect id="fn97t"></delect></meter></nobr>

                                                  <nobr id="fn97t"></nobr>

                                                    <nobr id="fn97t"><meter id="fn97t"></meter></nobr>

                                                      <track id="fn97t"></track>

                                                        <font id="fn97t"></font>

                                                        <sub id="fn97t"><meter id="fn97t"><cite id="fn97t"></cite></meter></sub>

                                                              跑跑卡丁车手游吧 河北时时彩走势图开奖 ig三分赛车计划 河南麻将必胜绝技 龙虎山 卡利亚里飞机场 龙族幻想游戏截图 魂斗罗归来刷钻石 城市猎人在线客服 浙江20选5开奖结果最新 彩经网 欢乐麻将血战到底规则 彩色三角试玩 逐鹿三国七星武将 腾讯游戏无限法则 atp巴塞罗那官网